TRAFFIC 12-2-7,2022 Middle Tennessee Lane Closures and Road Construction
MIDDLE TENNESSEE SCHEDULED LANE CLOSURES
December 1 - 7, 2022
FOR YOUR CLOSE TO HOME TRAFFIC FIND YOUR LOCATION HERE
To subscribe to the TDOT-REGION-3-LANE-CLOSURES list, send an email to LISTSERV@LISTSERV.TN.GOV and type subscribe TDOT-REGION-3-LANE-CLOSURES in the message body. To unsubscribe from the TDOT-REGION-3-LANE-CLOSURES list, send an email to LISTSERV@LISTSERV.TN.GOV and type unsubscribe TDOT-REGION-3-LANE-CLOSURES in the message body. DAVIDSON COUNTY I-24 The grading, drainage, construction of a retaining wall, signal traffic and paving on I-24 at the EB exit ramp to SR 254 (Bell Rd., Exit 59) (LM 23.25 - LM 24.30)- Nightly, excluding weekends, 8 p.m. – 5 a.m., There will be lane closures on I-24 EB and Bell Road, for construction activities.
- 12/1 - 12/4, 8 p.m. – 5 a.m., There will be a ramp closure of the I-24 EB exit ramp to Bell Rd. each night to install epoxy overlay.
- Nightly, 8 p.m. – 5 a.m., There will be alternating lane closures EB and WB for paving activities.
- Nightly, 8 p.m. – 5 a.m., EB lanes only, closures to install new snow plowable markers in place of missing markers. One lane will remain open at all times
- Nightly, 8p.m. – 5 a.m., There will be alternating lane closures in both directions on I-40 from Charlotte Pk to 46th Ave for final striping and scoring.
- 12/7, 10 a.m. – 2 p.m., There will be rolling roadblocks for blasting operations. Blasts are tentatively scheduled.
- 12/1 – 12/2, 8 p.m. – 5 a.m., There will be single-right lane closures on I-40 WB for the installation of a extruded panel sign. Lane closure will not be a continuous lane closure, only where needed. MM 192 – 200
-
- 12/1 – 12/7 8 p.m. – 5 a.m. There will be single-right lane closures on I-40 EB for the installation of a extruded panel sign.
- MM 191 – 192
- MM 194 - 196
- 12/1 – 12/7 8 p.m. – 5 a.m. There will be single-right lane closures on I-40 EB for the installation of a extruded panel sign.
- 12/4 – 12/7 8 p.m. – 5 a.m., There will be Single right lane closures on I-40 EB for the installation of a extruded panel sign.
-
- MM 198 – 199
- MM 200 – 201
- 12/5 – 12/7, 8 p.m. – 5 a.m., There will be alternating double-right and a triple-left lane closure alternating as needed on I-40 EB for the installation of an extruded panel sign.
- MM 200 - 201
- Daily, 7:30 a.m. – 6 p.m., There will be temporary daytime shoulder closure for the drilling of the foundations for CCTV cameras at various locations throughout the project limits.
- Nightly, 8 p.m. - 5 a.m., There will be alternating lane closures on I-40 EB and WB from S. Hartman to Smith Co. Line for final pavement markings
- Daily, 9 a.m. – 3 p.m. & 8 p.m. – 5 a.m., There will be temporary lane closures on SR 254 (OHB) in both directions for grading, signal work and to switch traffic layout. Two lanes will remain open in each direction.
- Nightly, 8 p.m. - 5 a.m., There will be temporary lane closures on I 65 NB to perform work to move the NB traffic into the median so that work on Phase 3 of the bridge can begin. At least one lane will remain open in each direction.
- Daily, 8 a.m. – 3 p.m., There will be daytime lane closures both NB and SB for thermoplastic activities. One lane to remain open at all times.
- Nightly, 8 p.m. – 4 a.m., There will be temporary lane closures on I-65 NB and SB for roadway maintenance and preparation for traffic shifts on north side of project, one lane will remain open at all times.
- Nightly, 8 p.m. – 5 a.m., There will be a lane closure on I-65 NB from MM 55.40 to MM 56.00 for barrier rail installation.
- Nightly, 8 p.m. – 5 a.m., There will be a lane closure for paving operations.
- 12/4, 8 p.m. – 5 a.m., There will be right lane closures and brief closures of on ramps to Ellington Pkwy in both directions to replace DMSs near Douglas Ave and Trinity Ln. Closures are expected to last no more than 20 minutes.
- 12/5, 8 p.m. – 5 a.m., There will be right lane closures and brief closures of on ramps to Ellington Pkwy in both directions to replace DMSs near Douglas Ave and Trinity Ln. Closures are expected to last no more than 20 minutes.
- Daily, 9 A.M. – 3 P.M., There will be a lane closure on Whites Creek Pk from Lloyd Rd to Seymour Hollow Rd for milling.
- Nightly, 8 p.m. – 5 a.m., There will be a lane closure on Trinity Ln from Dickerson Pk to Whites Creek Pk for concrete curb ramp work.
- Daily, 9 a.m. – 3 p.m. There will be a temporary alternating lane closure on SR 112 Clarksville Pike in both directions for grade work, storm drainage, sanitary sewer and overhead power. Flaggers will be utilized.
- 12/5 – 12/7, 8 p.m. – 5 a.m., There will be temporary road closures on SR 99 for the demolition of phase 3 bridge. Traffic will be open fully each morning.
- Daily, 9 a.m. – 3 p.m., There will be temporary lane closures on SR 6 both directions from Crossing Blvd to Fryer Rd for milling and paving operations
- Daily, 9 a.m. – 3 p.m., Traffic is currently running in its final alignment, there will be temporary lane closures for final phase of construction at various locations throughout the project. Mayhew Road is now open.
- Nightly, 8 p.m. – 5 a.m., There will be lane closures for striping
- Daily, 9 a.m. – 3 p.m., There will be alternating lane closures for construction activities.
- Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
- Daily, 9 a.m. – 3 p.m., There will be periodic flagging operations for construction activities.
- Daily, 9 a.m. – 3 p.m., We anticipate needing intermittent stoppages of traffic, and/or temporary lane closures (one direction at a time) between the hours of 9AM and 3PM Monday thru Friday, and possibly on Saturday (although not currently scheduled) for various construction activity including paving and utility work throughout the project. We are planning on having extended delays and possible lane closures for construction activities for the following side roads: Ashby, Drive, Holly Tree Gap Rd, Long St, West Concord, Wikle Rd and Mt. View Rd.
- Daily, 9 a.m. – 3 p.m., There will be lane closures and brief stoppages of traffic for utility relocations and grading work.
- Nightly, 8 p.m. – 5 a.m., There will be a lane closure between Main St and I-65 for paving and striping operations.
- Nightly, 9 a.m. – 3 p.m., There will be a lane closure between Boyd Mill Ave and Hillsboro Rd (SR-106/US-431) for paving and striping operations.
- Nightly, 8 p.m. – 5 a.m., Alternating lane closures in EB lanes from MM 53 – 63.
- 12/6 & 12/7, 9 a.m. – 3 p.m. There will be lane closures in the right two lanes NB to repair a hole in the bridge deck. The left lane will remain open. MM 5 - 6